RailsWA
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Rio Tinto load first Mesa A train.

2 posters

Go down

Rio Tinto load first Mesa A train. Empty Re: Rio Tinto load first Mesa A train.

Post  wn514 Fri Feb 19, 2010 11:36 pm

Toad Montgomery wrote:The trains will be the same as the J trains, 163 cars and three locos.
Test trains of ten cars still running at present, though first train isn't that far off.

The line to Mesa A is / will be the mainline, the junction at the 191 km, called Deepdale Junction is where the J trains take the switch to Mesa J.
The line from Deepdale Junc to Mesa A is about 30 km long, with a loadout tunnel and ballon loop at Mesa A.
Mesa A is at the 229.9 km.
thanks toad.
wn514
wn514

Posts : 116
Join date : 2010-02-14
Age : 58
Location : goldfields

http://flickr.com/photos/wn514/

Back to top Go down

Rio Tinto load first Mesa A train. Empty Re: Rio Tinto load first Mesa A train.

Post  Toad Montgomery Thu Feb 18, 2010 9:10 am

The trains will be the same as the J trains, 163 cars and three locos.
Test trains of ten cars still running at present, though first train isn't that far off.

The line to Mesa A is / will be the mainline, the junction at the 191 km, called Deepdale Junction is where the J trains take the switch to Mesa J.
The line from Deepdale Junc to Mesa A is about 30 km long, with a loadout tunnel and ballon loop at Mesa A.
Mesa A is at the 229.9 km.


Last edited by Toad Montgomery on Thu Feb 18, 2010 9:13 am; edited 1 time in total (Reason for editing : Added km data.)
Toad Montgomery
Toad Montgomery

Posts : 84
Join date : 2010-02-08
Location : The Golden Mile

http://www.pilbararailways.com.au/

Back to top Go down

Rio Tinto load first Mesa A train. Empty Re: Rio Tinto load first Mesa A train.

Post  wn514 Mon Feb 15, 2010 10:18 pm

any idea yet toad what the length of the trains is going to be on the mesa line?
wn514
wn514

Posts : 116
Join date : 2010-02-14
Age : 58
Location : goldfields

http://flickr.com/photos/wn514/

Back to top Go down

Rio Tinto load first Mesa A train. Empty Rio Tinto load first Mesa A train.

Post  Toad Montgomery Mon Feb 08, 2010 3:35 pm

Ten cars were loaded as a loadout test / trial on the 3rd Feb 2010.
Lead loco was 8104 and 2 Pepsi Cans (original HI Dash 9).
Wagons were the Robe style of car.

The Mesa A line branches off the Deepdale (Pannawonica) line near the 191 km post.
The line also has an extra siding, "Churdy Pool", located around the 168 to the 171 km.

Cheers,
Toad Montgomery
Toad Montgomery

Posts : 84
Join date : 2010-02-08
Location : The Golden Mile

http://www.pilbararailways.com.au/

Back to top Go down

Rio Tinto load first Mesa A train. Empty Re: Rio Tinto load first Mesa A train.

Post  Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum